首页 > Brand of water purifier  >  Shandong Chemical Industry Park sewage treatment standards to be released from the city main city

Shandong Chemical Industry Park sewage treatment standards to be released from the city main city

2020-06-26 07:21:16 the and 我要评论

October 15, Shandong Provincial Standing Committee passed the "Shandong Province Chemical Industry Park management practices identified." "Rules" is the overall security risk assessment has approved the aging period, the environmental impact assessment and feasibility reports of water resources planning. In order to further optimize the chemical park layout to enhance the safety level chemical parks, promote the transformation and upgrading, quality and efficiency, accelerate the development of new and kinetic energy conversion, "measures" clearly, built-up area contiguous area of ??Chemical Industry Park in more than five square kilometers, or planning contiguous area of ??more than 8 square kilometers, built-up area of ??more than 3 square kilometers, is located away from the main city of the city, not in the main city of the dominant wind direction.

from the sensitive points of the park production, storage and schools, hospitals, residential areas and other centralized comply with the relevant requirements of national security, health protection and other districts of the city or county government has prepared plans and commitments in 2020 June 30 to complete the relocation deemed eligible.

to have centralized sewage treatment facilities

hazardous waste disposal rate of 100%

Chemical Industrial Park sewage treatment effluent quality in line with "urban sewage treatment plant pollutant emission standards "a level indicator requirements and standards relevant local standards. Park sewage outfall into the river settings should comply with relevant regulations, sewage discharge does not affect the receiving water body to achieve water quality and downstream water function zoning objectives determined.

hazardous waste disposal rate of 100% in the chemical park. Equipped with safety, environmental monitoring and control system set. EIA approval requirements provided The groundwater monitoring wells and running.

When there is no annual limit approved by the environmental protection, supervise the handling and rectification is not complete and other matters. According to industry conditions and characteristics of planning and construction of major products, equipped with fire fighting facilities and power meet the safety requirements.

found the park overall score should be above the prescribed criteria

zone identified to be the basis of the 12 necessary conditions are met, in accordance with "Shandong Chemical Industry Park score," Planning of the park, aspects of public infrastructure, safety, environmental protection, economic development and other refined Fufen, finds that the park should always score above the prescribed criteria.

    分享:

    微信

    猜你喜欢

    小编推荐

    热门排行